Fusina – Italy


Timings

Start-up 2020
Work duration: 12 months

Site

Italy

Business Line

Flue gas treatment

FLOW RATE[ Nm3/h wet @inlet ]: 52000 @ 190°C

POTENTIALITY [tonnes/year]:
37230 @ PCI 4060 kcal/kg
MSW + MISCELLANEOUS
1 LINE 20 MWth cad

Adaptation of the flue gas treatment line of the existing waste-to-energy plant in Fusina (VE) consisting of:

  • A new dry deacidification system with sodium bicarbonate instead of the existing injection with milk of lime and washing column;
  • New 105m3 Bicar dosing silo;
  • Replacement of existing ducting and upstream filter manifold with insertion of a new scraper bottom and static mixer;
  • A new dioxin and heavy metal removal system with activated carbon instead of the existing washing column;
  • Enhancement of the dedusting system by increasing the filtering surface area by replacing the current round sleeves with larger, new oval ones;
  • New storage and unloading unit for sodium residue products (PSR).