Le Havre – France


Timings

Start-up 2023
Work duration: 13 months

Site

France

Business Line

Flue gas treatment

FLOW RATE[ Nm3/h wet @inlet ]: 72,000 BIOMASS + RDF 1 LINE 43.5 MW

A new flue gas treatment line complete with:

  • Axial cyclone to protect the bag filter from sparks and unburnt ash.
  • All-in-one system that includes:
    • A dry reactor (preceded by an injection of sodium bicarbonate and lignite coke in addition to a static mixer).
    • A vertical bag filter with sleeves of oval cross-section. The bag filter will consist of 4 independent cells. An ammonia injection section.
    • A steam / flue gas heat exchanger A non-compartmentalised SCR catalytic reactor without regeneration system.
    • One flue gas/water economiser.
    • One draught fan (with silencer).
  • Reagent part:
    • An ash storage silo, with its conveying system: includes ash collection under the boiler and under the ECO.
    • One lignite coke storage silo (equipped with the dosing and injection system).
    • A sodium bicarbonate storage silo (equipped with the dosing and injection system).
    • A storage tank for the 24.5% ammonia solution.