Ravenna – Italy


Timings

Start-up 2023
Work duration: 36 months

Site

Italy

Business Line

EPC - Combustion and Flue Gas Treatment

FLOW[ Nm3/h wet @inlet ]: 55.000 Nm3/h @ 280 °C

POTENTIALITY [tonnes/year]: 50.000 RSP e Fanghi 25Mwth

Upgrading of the waste incineration line of plant F3, the work comprises: Revamping of the combustion part and steam generator, consisting of waste loading system, rotary drum furnace, static chamber, including refractory and burners, renovation work on the steam generator.
The flue gas line consists of: temperature control exchanger, wet scrubber section, post-heating steam exchanger, bag filter, condensate subcooling, low temperature DeNOx SCR reactor, tail fan.