Vert le grand – France


Timings

Strat-up 2020
Work duration: 6 months denox lot and 6 months filtration lot

Site

France

Business Line

Flue gas treatment

FLOW RATE[ Nm3/h wet @inlet ]: 76,000 @ 205°C nom inlet FAM; 73,000 @197°C nom inlet SCR

POTENTIALITY [tonnes/year]: 2 lines, 126,000 per MSW line, 39.3 MWth each

Work for the transition from semi-wet to dry treatment of 2 incineration lines, each consisting of a bag filter, DENOX SCR tail-end with catalyst running regeneration system, reagent storage and dosing systems, tail fan.